Utility


Animas River Substation

The Animas River Substation is just one example of control building work that SECO Construction has provided for the Western Area Power Administration all over the western part of the United States. This project is unique due to its location immediately next to the Animas River in Durango, CO. This building featured a maintenance free masonry veneer and standing seam metal roof exterior along with extensive electrical systems within the building. Full Details

*


Croyle II Well House

The Whispering Pine subdivision southwest of Rapid City had outgrown its water delivery system and well. This project updated and improved water delivery to the Whispering Pine subdivision. The project included a basic wood framed structure that houses process piping and water treatment systems commensurate with a well house. Full Details



Mt. Rushmore Water Treatment Plant Improvements

The National Park Service required a facility to increase capacity and more fully treat the well water supply for the Mount Rushmore National Memorial. SECO Construction was selected on a best value solicitation to provide construction services. SECO built an addition to the existing facility with concrete foundations, CMU walls and metal roofing. The project also included new process piping, membrane filtration systems, chemical feed systems and controls integrated into the existing water system. Full Details



Honorable Mentions

Wheelock Substation Control Building
Blaisdell Substation Control Building
Crow Lake Collector Substation Control Building
Rhame Substation Control Buildings
Dry Fork Switchyard Control Building
Loveland East Substation
Viewfield Rural Water System Phase IIA
Tongue River Substation
Cedar Creek Wind Substation
Box Elder Pump House and Packaged Booster Station
Colonial Pine Hills Booster Station